Phase 2 review corrections — three spec violations fixed
1. Chatzotzrot signal mapping corrected to match Architecture §3.12: assembly_all→tekiah, assembly_leaders→teruah, breaking_camp→tekiah_teruah, moadim→tekiah_tekiah. Four of five patterns were swapped. All five now match Bamidbar 10. 2. Manna parse_datetime(nil) bug fixed: missing expires_at now fails validation instead of silently returning DateTime.utc_now() which created a race condition where manna appeared expired. 3. Festival detection implemented in cloud.ex: pre-computed Gregorian dates for Pesach, Shavuot, Rosh Hashanah, Yom Kippur, Sukkot, Shemini Atzeret (2025-2028). Pipeline now halts on Yom Tov as Torah requires. Step 15 verification now covers festival rest. 76 tests, 0 failures (68 prior + 8 new). Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
1 parent
5e97874083
commit
61243ac832
6 files changed
+226
-30
No files matched your search
@@ -631,3 +631,53 @@ Elixir (BEAM VM) External Processes
|
||||
│ (direct call) │ └─ escalation:submit_case/1
|
||||
└─────────────────────────────┘
|
||||
```
|
||||
|
||||
---
|
||||
|
||||
## Session: 2026-03-12 — Step 15: Verification (The Shema Test)
|
||||
|
||||
**Spec reference:** Architecture §4 Phase 2 step 15, §6.3 (The Shema Test)
|
||||
|
||||
### What Was Built
|
||||
|
||||
**Code change:** Wired `HaltConditions.check_all/1` into `BereishitCycle.erev_voker/2`. Previously dead code — the three cardinal sin monitors existed but were never called during pipeline execution. Now `erev_voker` checks halt conditions on the final result before returning.
|
||||
|
||||
**Test suite:** `vav_pipeline/test/step15_shema_test.exs` — 22 tests implementing Architecture §6.3:
|
||||
|
||||
| Test Group | Count | Spec |
|
||||
|------------|-------|------|
|
||||
| Te'amim reception | 4 | §6.3 Test 1 |
|
||||
| Ketiv/qere preservation | 4 | §6.3 Test 2 |
|
||||
| Cloud obedience | 3 | §6.3 Test 3 |
|
||||
| Manna fidelity | 2 | §6.3 Test 4 |
|
||||
| Context immutability | 1 | §6.3 Test 5 |
|
||||
| Halt condition integration | 5 | §6.2 |
|
||||
| Full pipeline end-to-end | 3 | §6.2 |
|
||||
|
||||
**Result:** 68 tests, 0 failures (46 existing + 22 new).
|
||||
|
||||
### Key Finding
|
||||
|
||||
`HaltConditions.check_all/1` was dead code. It existed, had unit tests, but was never called in the pipeline. Step 15 made it live by inserting `check_halt_on_output/1` into `erev_voker`. This is the correct location — halt conditions are checked on the cycle's output, not its input.
|
||||
|
||||
### Files
|
||||
|
||||
| File | Action |
|
||||
|------|--------|
|
||||
| `vav_pipeline/lib/vav_pipeline/bereishit_cycle.ex` | Modified — halt check in erev_voker |
|
||||
| `vav_pipeline/test/step15_shema_test.exs` | Created — 22 tests |
|
||||
|
||||
### Phase 2 Status
|
||||
|
||||
Steps 8-15 complete. Phase 2 (Processing) is done.
|
||||
|
||||
| Step | Status |
|
||||
|------|--------|
|
||||
| 8. Vav Pipeline | Done |
|
||||
| 9. Shema context builder | Done |
|
||||
| 10. Cloud governance | Done |
|
||||
| 11. Manna provision | Done |
|
||||
| 12. Sanhedrin framework | Done |
|
||||
| 13. Korban Processor | Done |
|
||||
| 14. Connect components | Done |
|
||||
| 15. Verification | Done |
|
||||
Reference in new issue
Block a user